INSTALLING
ON CONCRETE OR MASONRY SURFACE:
1.Place all mats in their final use
positions.
2.For each mat, mark the center of
all 4 corner grommets on the surface, then move the mats aside so the anchor
holes can be drilled.
3.Using a 5/16” diameter masonry
bit and drill, drill a 2” deep hole at each mark.
4.Blow the masonry dust our of each
hole. A “Duster”-type compressed gas can works well for this.
5.Place one anchor in each hole and
tap until flush or below flush with a hammer.
6.Replace the mats in position,
insert a screw in each anchor, and install with a Phillips screwdriver.
When
storing the mats for the off-season, replace the screws in the anchors to keep
out debris.